Palace Cinema

Palace Cinema

BUILDER: HUTCHINSON BUILDERS

PROJECT LENGTH: 5 MONTHS October 18— February 2019

CONTRACT VALUE: $1.2m

PROJECT DETAILS:
Built as part of the new Mercato on Byron shopping centre, the Palace Cinemas were built to achieve an exceptional sound, visual and comfort experience. It was designed with extra design features such as recessed light pelmets, wall coverings and extra-thick walls for the maximum impact.

PROJECT OUTCOMES:
Needing to offer its patrons the complete cinema experience, meant that the sound acoustic performance has to be spot on. Blueline Commercial achieved the acoustic and sound outcomes required with 3 layers of 16mm fyrechek to 7m high. The thickness of the walls and ceilings and the height of the ceilings made it a challenging site. It has achieved all that it was required and more. It looks and sounds great!